Apr
12
2010
Productive day. Eighty-nine left.
Posted by: Michael Slater in Uncategorized, tags: bicycle, framebuilding, workshop
I finished mitering the main triangle of Mini-Velo #1 today. I’ll braise it tomorrow morning. Using laminated mitre templates printed from BikeCadPro makes this go way faster. I’ve got four to build in total, so I need to work quickly.
In a stretch, tomorrow I’ll also do the chainstays. I measured out tire clearance today to ensure the frame will work on some large Schwalbe Marathons that are roughly 45mm.
I’m hoping these guys will want to use these sexy CNC’d single-speed aluminum big chain rings. I think they should be perfect for gearing and look great.



Entries (RSS)