Looks like I’ll get the “keys” (the place is unlocked and empty) to my house a day before we go back to the US for the better part of a month.  Tuesday I sign the loan documents and on the eighth I’ll sign the final papers.

A builder/contractor/designer is already working on some drafts for the renovations.  I had to spend an hour last week poring over three separate spools of microfiche (ugh) to find all the architectural and structural plans to my house.   I printed these and gave them to the builder.

Finding the plans was a chore.  My house is a part of a large project.  For any house their are two sets of plans, structural and architectural.  I had to find a master map of the project, realize my house was a “Type B” home, and then read through the whole project’s plans, pulling out anything that was general or for Type B homes.  It appears that the diagrams for a type B home are for the left-hand side homes, and mine is a right, so all my blueprints have to be reversed when you read them.  A further nuisance is that errata are filed against the original plans.  In my case, my project had three tiers of errata for both the architectural and structural plans.

Hopefully I pulled out 98% of what I should have. I am sure I missed a piece here or there. If so, tough, my contractor can go retrieve whatever is missing or wrong.

One Response to “41 Springleaf Update”
  1. Auntie Shannie says:

    Can you post the plans?

Leave a Reply